Schofields Road Upgrade Between Tallawong Road and Veron Road

Project Details

  • Location: Sydney, NSW
  • Client: OHL/York Civil Joint Venture
  • Completion Date: TBD


Overview

Mikcon have been contracted to work with the Schofields Road upgrade between Tallawong Road and Veron Road to complete 12km of storm water drainage. Mikcon have since been awarded with the 14km subsoil package and associate structures. The storm water drainage pipe sizes vary from 225 to 1050 RCP pipes. The scope of works also includes removal of existing storm water and installation of pipe culverts.