1800 MIKCON
Project Details
Overview
For this portion of the Westconnex project, Mikcon have been contracted to work with the RIZZANI CPB JOINT VENTURE to complete the storm water drainage for the m4 widening. The storm water drainage pipe sizes vary from 225 to 900 RCP pipes.